challenge
Struggling to meet customer demands and expectations for new and revised designs, the company realized that its Engineering Change & Release Control function (ECRC) was a significant bottle-neck for its engineering center and many global manufacturing locations.
solution
OEi consultants evaluated the current processes and roles, and studied best practices along with benchmark cycle-times, then redesigned and implemented a new ECRC function and systems, which included:
- Restructured and centralized the ECRC administration department.
- Led the design, development, migration, and launch of electronic / online approval ECRC system, including network, hardware, and software development.
- Included online drawing overlay markup capability with full CAD system integration. (Commercial products were not sufficient at the time.)
results
Company’s Automotive Products Are First Off the Line!
Below are shown some of the key benefits the organization experienced as a result of this work:
- Decreased product development-to-manufacturing cycle time by 73%.
- Reduced administrative headcount by 22% (from 18 to 14 FTEs).
- This project won the corporate Chairman’s Award for Innovation.